Session 14: Economics, management and design in the mining indust
10 September 2008
The Portrait Hall, Auditorium Maximum of the Jagiellonian University (35 Krupnicza str.)
Chairman: John E. TILTON
Co-Chairman: Roman MAGDA
Secretary: Patrycja BĄK
SESSION SPONSORED BY:
9.00 - 9.15 a.m.
G.G. Pivnyak, U.T. Rasumny, A.V. Rukhlov
Aspects of the fuel industry development in Ukraine
9.15 - 9.30 a.m.
G. G. Pivnyak, P.I. Pilov
Strategy of coal industry development in Ukraine
9.30 - 9.45 a.m.
J. Engel, P. Rybár
Substitutability of capital and sustainable development in mining
9.45 - 10.00 a.m.
V. Bauer
The risk evaluation in expected uranium mining at Slovakia
10.00 - 10.15 a.m.
K. Doerfler, M. Wurm
Talc mining in Austria: sustaining activities in the face of scarce resources and competing interests
10.15 -10.30 a.m.
Discussion and comments
10.30 - 11.00 a.m.
Coffee break
11.00 - 11.15 a.m.
F. Buse, I.N. Tiuzbaian, N. Dobritoiu
The simulation of longwall complex mechanized operating face system
11.15 - 11.30 a.m.
N. Tiuzbaian, F. Buse, N. Dobritoiu
The influence of ‘labor' production factor upon work quoting and productivity in mechanized mining
11.30 - 11.45 a.m.
M. Jaszczuk, J. Kania
Theoretical consideration in establishing the parameters of longwall panel
11.45 - 12.00 a.m.
R. Magda & T. Franik Planning and design of rational parameters of longwall panels in underground hard coal mines
12.00 - 12.15 p.m.
R. Magda, T. Woźny, S. Głodzik, J. Jasiewicz
Data management for the mine production planning and design
12.15 - 12.30 p.m.
Discussion and comments
1.00 - 3.00 p.m.
Lunch
3.00 - 3.15 p.m.
Q. Wang, X. Gu & D. Chu
A dynamic optimization method for determining cutoff grades in underground mines
3.15 - 3.30 p.m.
J. Sattarvand, Ch.Niemann-Delius
Perspective of metaheuristic optimization methods in open pit production planning
3.30 - 3.45 p.m.
A. D. Akbari, M. Osanloo, M.A. Shirazi
Ultimate Pit Limit (UPL) determination through minimizing risk costs associated with price uncertainty
3.45 - 4.00 p.m.
A.Shahinkar, K.Shahriar, A.Asadi, A.D.Akbari
Feasibility study of oil mining - a fuzzy AHP decision making approach
4.00 - 4.15 p.m.
H. Owladeghaffari, K. Shahriar, Gh. R. Saeedi
Assessment of effective parameters on dilution using approximate reasoning methods in longwall mining method, Iran coal mines
4.15 - 4.30 p.m.
Discussion and comments
4.30 - 5.00 p.m.
Coffee break
5.00 - 5.15 p.m.
R. Sayadi, M. A. Hosseini, V. Bozorgi
Price instability and terms of trade for mineral commodities in the last two decades
5.15 - 5.30 p.m.
B. Soliński, I. Soliński
Economical appraisal of the energetic application of hard coal in co-combustion process with biomass in system power plants
5.30 - 5.45 p.m.
M. Sierpińska, A. Kustra
Bonus systems in mining industry, current situation and future developments
5.45 - 6.00 p.m.
A. Kustra
Cost calculation in the mining activity treated as a project - strategic and operational approach
6.00 - 6.15 p.m.
A. Dyczko, M. Kopacz
Dilution influence on value of mining investment projects and selected production figures by a copper mine example
6.15 - 6.30 p.m.
P. Bąk
Securitization as a method of financing coal mining industry
6.30 - 6.45 p.m.
Closing Session 14